Energy Efficiency Energy Management Systems Service
Case Studies Join Our Team Contact Us
Sign in

Check your meter.

BuildingPulse reads your electric meter every few minutes. Two questions tell us whether FMC can connect to the meter you have, or whether your building needs a smart meter.

Two electric meters: one with a digital screen, one with four dials over a spinning disc. ELECTRIC METER KILOWATTHOURS FORM 16S · CL200 · 120-480V Kh 21.6 · 3 STATOR · 60Hz N° 208 441 0731

What does the meter look like?

The electric meter is usually on an outside wall or in the electrical room.

An electric meter with a small box beside it marked KYZ: the pulse output. KYZ KYZ Pulse output

Is there a pulse output at the meter?

Look for a small box beside the meter, often marked KYZ or PULSE, with a thin cable running from it. Many meters do not have one.

Then send it to FMC.

Answer what you can above. Not at the meter? Send this as it is, and FMC will check it for you.

Send this to FMC, and a person there writes back to set up the next step.

Please enter your name.

Please enter a valid email address.

It’s on its way. A person at FMC reads it and writes back about the next step for your building.

Rather talk it through? Call (978) 856-7862. Or see how BuildingPulse works.